1. Operator Observance shall be conducted for all operator to verify their daily working as per set standard on timely basis.
2. Production Head shall prepare Operator Observance plan for all operators at a frequency of 1 month.
Passing Criteria is 100 %
3. Operator Observance shall be conducted by respective supervisor as per Operator Observance Sheet.
4. In case of any failure retraining shall be planned on same day.
5. Effectiveness Monitoring will be done and record to be maintained in Training Attendance Sheet.
No comments:
Post a Comment